The network code on demand connection entered into force on 07 September 2016. It is binding and directly applicable in all Member States.

National Legislation (The Netherlands)
Country:
The Netherlands
Categories:
Regulation
Affected LAPs:
Connecting electrolyser to the electricity grid (as a consumer)
Electricity grid issues for electrolysers / Connection of the E-grid to the electrolyser