Permission to connect/inject

This LAP concerns the permitting framework and processes (or restrictions) for hydrogen based SNG (via methanation) and injection into the gas grid at TSO or DSO level, along with technical requirements for and oversight of local grid connection facilities

Glossary:

Permission and additional restrictions regarding connection points for SNG from hydrogen compared to natural gas connection points.
Connection: “Network connection” refers to the connection of the hydrogen generating plant to the existing gas supply network, the link to the connection point of the existing gas supply network, the gas pressure control measuring system, the means for increasing the pressure and the verifiable measurement of the hydrogen to be fed.
Injection: Gas grid access (injection) is the system under which market players are allowed to use capacity in a pipeline, network, gas store or other gas facility.
The injection installation is related to the connection facility.
Is it a barrier?
Assessment Severity
NA

Questions:

Question 4 What is your legal situation (requirement form legislation and administrative procedures) with regard to a national connection for the injection in the gas grid? Is there a difference if injection takes place in an isolated (regional) network without international interconnections?
A system user agreement must be concluded in order to establish the connection and to inject in the gas grid. There is no difference about the place where the injection will happen.