Connecting electrolyser to the electricity grid (as a consumer)
This LAP is concerned with formal procedures and arrangements via a responsible/legal authority for access to the e-grid (at a local or other level) for electrolyser connection and whether an electrolyser connection is treated differently to connection of a conventional electricity consuming load. If an electrolyser load is treated differently then the variance in procedures are sought to be identified
Glossary:
Permission (process) and additional restrictions regarding the connection of the electrolyser to the electricity grid.
Is it a barrier?
Yes
Type of Barrier
Structural barriers, Economic barriers, Regulatory gap
Assessment Severity
2
Assessment
Connecting electrolyser to the electricity grid is possible as for any other electricity consumer, but there is no framework, technical and legal for hydrogen production via electrolyses for energy storage or re–electrification.
Questions:
Question 1
Which is the responsible authority/legal entity for connection of an electrolyser to the electricity grid?
Authority: Romanian Energy Regulatory Authority – ANRE (Autoritatea Naţională de Reglementare în domeniul Energiei).
Legal Entity: The licensed electricity, Distribution Network Operator (DNO) at the location where the electrolyser is connected.
Question 2
Connection procedure and requirements:
Are the steps different between an electrolyser and any other connecting consumer-facility (e.g.: industrial installation of similar demand)?
No.
Describe the comparable technology and its relevance with regard to hydrogen
Brine electrolysis installations.
National legislation:
-
Energy law no. 123/2012
National legal framework referring to energy.
- Order ANRE (Romanian Energy Regulatory Authority) no. 59/2013 about the Connection Regulation
-
Order ANRE (Romanian Energy Regulatory Authority) no. 63/2014 about modifying and completing the Connection Regulation
Technical order referring to connection within electricity grid.
-
Order ANRE (Romanian Energy Regulatory Authority) no. 102/2015 about Technical Solutions on connection to grid
Technical Solutions on connection to grid
EU Legislation:
-
Directive 2009/72/EC of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in electricity
Directive 2009/72/EC establishes common rules for the generation, transmission, distribution and supply of electricity, together with consumer protection provisions. It lays down the rules relating to the organisation and functioning of the electricity sector, open access to the market, the criteria and procedures applicable to calls for tenders and the granting of authorisations and the operation of systems. It also lays down universal service obligations and the rights of electricity consumers and clarifies competition requirements.
Article 25 establishes the “Tasks of the distribution system operator” which include: ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity […] as well as to ensure that the system operator does not discriminate between system users or classes of system users including e.g. when setting rules for the charging of system users, etc. Article 25 allows, however to require the distribution system operator to give priority to generating installations using renewable energy sources or waste or producing combined heat and power.
Article 32 sets the rules on “Third party access”: access to the transmission and distribution system, and LNG facilities shall be based on published tariffs, without discrimination between system users. The transmission or distribution system operator may refuse access where it lacks the necessary capacity. Duly substantiated reasons must be given for such refusal, -
Commission Regulation (EU) 2016/1388 of 17 August 2016 establishing a Network Code on Demand Connection
Regulation 2016/1388 establishes a network code which lays down the requirements for grid connection of:
• transmission-connected demand facilities;
• transmission-connected distribution facilities;
• distribution systems, including closed distribution systems;