This LAP concerns the injection of hydrogen based SNG (via methanation) into the gas grid at TSO or DSO level and the cost allocation, payment and incentives framework covering injection installations and hydrogen gas conveyance via the gas grid
 
Is the legislation with regard to injection of Methane (SNG) via methanation from hydrogen the same as for hydrogen? if yes, question 2-9 are the same as for category 7, application 1: injection of hydrogen in the gas grid and do not have to be answered
Who bears the following costs and if they are shared between the DSO/TSO and the hydrogen facility operator/ supplier – in which proportion. a
) grid connection costs: i. for connecting facility ii. for connecting pipe line b) costs for availability of the network connection, maintenance and operation of the network connection c) feed-in costs d) remuneration for avoi
a - grid connection costs: i. for connecting facility ii. for connecting pipe line
b - costs for availability of the network connection, maintenance and operation of the network connection
c - feed-in costs
d - remuneration for avoided network costs
e - tax incentives
In case additional costs occur for injection of SNG from hydrogen in the grid, e.g. metrology, in your country compared to natural gas injection, who will bear these costs? Please indicate which additional costs and who will bear these costs.
Is a SNG from hydrogen injection connection point treated in the same way as a natural gas injection point with respect to the (transport) tariffs framework?
Does the sustainability (SNG from hydrogen in the natural gas grid) have additional financially benefits for you as a TSO/DSO besides the regular transportation fees?
Does a TSO/DSO have contractual agreement and/or responsibilities with the supplier/shipper with regard to injection of SNG from hydrogen in the grid that could influence/affect payment issues?
Are there any benefits from the national tariff-system in relation to “sustainable” / “non (or less)-sustainable” with regard to SNG from hydrogen – natural gas blend?
Are there any incentives granted for the SNG from hydrogen facility operator/supplier?
Does a TSO/DSO have contractual agreement(s)/responsibilities related to the national regulation with regard to injection of SNG from hydrogen in the grid that could influence/affect fees/taxes .
Is it a barrier? Yes
Type of Barrier Structural barriers, Operational barriers, Economic barriers, Regulatory gap
Assessment Severity
3
View Legislation Table
PDF Export | Excel Export
The information is correct There are errors ...
Submit a suggestion for improvements
This map depicts the severity of this barrier across the HyLaw Partner countries.
  •   No barrier
  •   Low
  •   Medium
  •   High
  •   Data not available
  •   Selected countries